June
6
2010
Afternoon drill behind the station! The crew from A-shift plus the faithful sidekick TK, set up for a foam drill using expired foam and a little elbow grease. The on-board foam system was by-passed by use of the manual foam drafting function. The crew operated for approximately 45 min, experimenting with different flow rates and foam proportions.


